Varrow
Varrow
Book an assessment
Industrial data engineering

Plant data your team can act on, from sensor to shift report

We connect the machines you already own, build the monitoring and maintenance models that matter, and stay until your own people run them.

Four kinds of work, one engineering team

Most plants already have the data. It sits in controllers, meters and paper logs nobody has time to read. We make it useful, one line at a time.

All services and prices

Featured client result

Measured on the shop floor, not in a slide deck

Every engagement starts with a baseline and ends with the same measurement, signed off by your plant manager.

plants connected since 2014
140
median drop in unplanned stops
27%
weeks to first live data
3
of pilots kept in production
9 of 10

How an engagement runs

Small steps with a decision after each one. You can stop after the assessment and still keep a plan you can use.

  1. 01 · 2 days

    Assess

    We walk every line with your team and rank the losses by what they cost.

  2. 02 · 3 weeks

    Connect

    One line goes live: controllers read, sensors fitted, data in one place.

  3. 03 · 10 weeks

    Prove

    Dashboards and alerts run on real shifts; we measure against the baseline.

  4. 04 · ongoing

    Hand over

    Your team takes over with training and documentation, or we keep running it.

Insights

Field notes from the plants we work in, written by the engineers who did the work.

All insights
Two days on site, a written plan in ten. Book a site assessment
  1. Home
  2. Services

Services and ways to work with us

Four kinds of work, three ways to buy them. Every price below is a starting point we confirm in writing after the site assessment.

Machine connectivity

We read data from the controllers, meters and sensors you already own, add retrofit sensors where a line is blind, and land it all in one historian your IT team approves.

3 weekstypical time to first live data

What you get

  • A survey of every line, controller and network segment
  • Retrofit vibration, power and temperature sensors
  • One historian, on site or in your own cloud
  • A network design signed off by your IT team

Dashboards and alerts

Shift-level dashboards that show stops, speed losses and scrap as they happen, with alerts that reach the right technician instead of everyone.

31%fewer unplanned stops at a three-site bakery group

What you get

  • Downtime reasons captured at the machine
  • OEE and scrap by line, shift and product
  • Alert rules tuned with your technicians
  • A weekly report your plant manager signs

Maintenance models

Models that warn days before a bearing, pump or motor fails, trained on your own history and checked against every repair your team logs.

9 daysaverage warning before a fan bearing failure

What you get

  • Failure history cleaned and labelled
  • Models for your ten most critical assets
  • Work orders raised in your maintenance system
  • A monthly accuracy review

Control and integration

Recipe changes, quality checks and reports moved out of spreadsheets and into the systems that run the line, with a rollback plan for every change.

40 minsaved on every product changeover

What you get

  • Recipe and setpoint management
  • Quality checks at the machine
  • Connections to ERP and maintenance systems
  • Change control and a rollback plan

Three ways to start

Prices exclude travel outside the UK and the Netherlands, and hardware we buy on your behalf at cost.

Site assessment

$9,800
fixed fee

Two days on site, a written report in ten working days and a 90-day plan you can run with or without us.

  • A walk of every line with your team
  • Data and network survey
  • Losses ranked by what they cost
Book an assessment

Operate

from $6,500
per month

We run, tune and extend what we built, with a named engineer and a response time written into the contract.

  • A named engineer and a backup
  • Four-hour response on critical alerts
  • A quarterly roadmap with your team
Talk to us

Questions we hear first

Do you work with older machines?

Yes. Most lines we connect are ten to thirty years old. Where a controller cannot share data, we fit sensors on the outside instead of opening the machine.

Where does our data live?

On a server in your plant or in your own cloud account. We never keep your production data on ours, and you keep every login when we leave.

Which systems do you connect to?

Common controllers, historians, ERP and maintenance systems. We confirm the list for your plant during the site assessment.

How long until we see results?

First live data usually arrives in three weeks. A pilot runs ten to twelve weeks, so the measurement covers normal production and a changeover or two.

Can our own team take over?

That is the goal. Every engagement ends with documentation, training for two shifts and a handover checklist your maintenance lead signs.

  1. Home
  2. Client results

Client results

Each result was measured against a baseline taken before we changed anything, and confirmed by the client's own team.

8 results

  1. Home
  2. Client results
  3. Hollin Foods
Case study · Food and beverage

Hollin Foods cut unplanned line stops by 31% across three bakeries

A family bakery group with eleven lines, three sites and a maintenance team of nine wanted to know why output dropped every Tuesday.

Client
Hollin Foods
Industry
Food and beverage
Sites
3 bakeries, 11 lines
Duration
14 weeks, then Operate
Services
Connect, Monitor
unplanned stops per week
−31%
more output on the worst line
+8%
to first live data
19 days
sensors retrofitted
64

The challenge

Stops were logged on paper at the end of each shift, so the reasons blurred into "mechanical" and "other". The weekly meeting argued about numbers instead of fixing machines.

What we did

  • Read the existing controllers on all eleven lines and fitted 64 sensors to the ovens, proofers and wrappers they could not see.
  • Put a reason picker on a tablet at each line, so operators log a stop in two taps while it happens.
  • Built one dashboard per shift and one per site, and tuned alerts with the technicians over four weeks.
Placeholder for a line photo: wrappers on line 4 at the main bakery.

The result

Tuesday turned out to be the day the main proofer was cleaned with a rushed restart. A changed procedure and one sensor alert removed most of the stops. Across all sites, unplanned stops fell by 31% in fourteen weeks.

For the first time the weekly meeting starts with the same numbers on every screen.

Operations director, Hollin Foods (placeholder quote)

Plan a pilot like this

Next result

Metals · Predict

Brask Metals: nine days of warning before furnace fan failures

  1. Home
  2. Insights

Insights

Guides, articles and one yearly report, written by the engineers who did the work.

Guide · Maintenance

A practical guide to vibration monitoring on older lines

2026-11-04 · 12 min

9 insights

  1. Home
  2. Insights
  3. Guide
Guide · Maintenance

A practical guide to vibration monitoring on older lines

Most rotating equipment tells you it is about to fail. On older lines nobody is listening, because the machines were built before anyone thought to ask.

Why vibration first

Bearings, gearboxes, fans and pumps cause a large share of unplanned stops on the lines we see, and almost all of them change how they vibrate long before they stop. A small sensor on the outside of the housing hears that change without touching the controller.

Choosing sensors

Start with the ten assets whose failure stops a whole line. For each one, pick the simplest sensor that can hear the fault you fear most.

AssetSensorTypical warning
Motor bearingTriaxial accelerometer7 to 14 days
GearboxAccelerometer and oil temperature5 to 10 days
FanAccelerometer and current clamp10 to 20 days
PumpAccelerometer and pressure3 to 7 days

Setting a baseline

Record two weeks of normal running before you set a single alert. Include a cleaning cycle, a changeover and a cold start, or the first of each will look like a fault.

Placeholder for a chart: two weeks of bearing vibration on a fan, with the cleaning cycles marked.

Alerts people trust

  • Send each alert to one named person, never to a shared inbox.
  • Say what to check and how urgent it is, in the words your technicians use.
  • Review every alert at the weekly meeting for the first two months, and delete the ones nobody acted on.

An alert that fires twice for nothing gets ignored the third time, when it matters.

Dev Okafor

Want help choosing your first ten assets? Book a site assessment.

  1. Home
  2. About

Engineers who stay until it runs

Varrow Systems is an engineering firm of 38 people in Leeds and Rotterdam. We started in 2014 because too many plant data projects ended with a report and no change on the floor.

What we hold to

  • Measure before and after

    Every project starts with a baseline and ends with the same measurement, signed off by your plant.

  • Build with the people who run it

    Technicians and operators shape the alerts and dashboards; nobody inherits a black box.

  • Leave it running

    Documentation, training and a handover checklist come with every engagement.

Twelve years, one line at a time

From a two-person controls shop to a team that has connected 140 plants.

  1. 2014Founded in Leeds by two controls engineers who were tired of reports nobody read.
  2. 2018First maintenance model in production, on a foundry's furnace fans.
  3. 2021Opened in Rotterdam to work with food and logistics clients across the North Sea.
  4. 2024The hundredth plant connected.
  5. 2026Started Operate for clients who want us to run what we built.

Leadership

Each of us still spends at least one week a month on a client site.

Join the team
  • EM

    Elin Marsh

    Managing partner, Leeds, with five more engineers who lead connectivity, data, automation, delivery and operations.

Offices

United Kingdom

Leeds

4 Canal Wharf, Leeds LS11 5PS

Visit or write to us

Netherlands

Rotterdam

Lloydkade 12, 3024 Rotterdam

Visit or write to us

  1. Home
  2. Careers

Work on real plants with a small team

We hire engineers who like being on the shop floor as much as at a keyboard. Every role below is open now.

Working here

  • Small teams

    Projects run with three to five people, so your work is visible.

  • Time to learn

    A yearly learning budget and one Friday a month for training.

  • Planned travel

    Site visits are planned weeks ahead, two nights away a week at most.

  • Flexible hours

    Office days in Leeds or Rotterdam, the rest wherever suits you.

Open roles

7 roles

Send an open application

  1. Home
  2. Events

Briefings, demos and site visits

Small sessions for operations and maintenance managers. Free to attend; places are limited so everyone can ask questions.

  • Plant data in a morning: a briefing for operations managers

    Leeds, in person · 09:00 to 12:00

  • Live demo: from vibration sensor to work order

    Online · 15:00 CET, 45 minutes

  • Site visit: a connected bakery line

    Near Leeds, in person · twelve places

  • Round table: energy per unit in food and drink

    Rotterdam, in person · 14:00 to 17:00

Reserve a place

Your role
  1. Home
  2. Contact

Tell us about your plant

An engineer, not a salesperson, replies within one working day. A short note is enough to start.

  1. Home
  2. Privacy and terms

Privacy and terms

Placeholder text. Replace it with policies reviewed for your company and the countries you work in.

Privacy policy

We collect the details you send through our forms and use them only to reply, to run an event you registered for, or to send the newsletter you asked for.

Client production data stays on the client's own systems. We do not sell personal data or share it with advertisers.

You can ask to see, correct or delete your details at any time by writing to privacy@varrow.example.

Terms of use

The content on this website is for general information. It is not engineering advice for a specific plant; that comes after a site assessment and a written agreement.

Client names and results appear with each client's permission.

Error 404

This page is not on the line

The link may be old, or the page has moved. These are the pages people look for most.