Site assessment
Two days on site, a written report in ten working days and a 90-day plan you can run with or without us.
- A walk of every line with your team
- Data and network survey
- Losses ranked by what they cost
We connect the machines you already own, build the monitoring and maintenance models that matter, and stay until your own people run them.
Most plants already have the data. It sits in controllers, meters and paper logs nobody has time to read. We make it useful, one line at a time.
All services and pricesRead the controllers, meters and sensors you already own; retrofit the blind spots.
Shift dashboards and alerts that reach the right technician, not everyone.
Maintenance models trained on your own failure history, checked against every repair.
Recipes, quality checks and reports moved out of spreadsheets, with a rollback plan.
Every engagement starts with a baseline and ends with the same measurement, signed off by your plant manager.
Small steps with a decision after each one. You can stop after the assessment and still keep a plan you can use.
We walk every line with your team and rank the losses by what they cost.
One line goes live: controllers read, sensors fitted, data in one place.
Dashboards and alerts run on real shifts; we measure against the baseline.
Your team takes over with training and documentation, or we keep running it.
Field notes from the plants we work in, written by the engineers who did the work.
All insightsFour kinds of work, three ways to buy them. Every price below is a starting point we confirm in writing after the site assessment.
We read data from the controllers, meters and sensors you already own, add retrofit sensors where a line is blind, and land it all in one historian your IT team approves.
Shift-level dashboards that show stops, speed losses and scrap as they happen, with alerts that reach the right technician instead of everyone.
Models that warn days before a bearing, pump or motor fails, trained on your own history and checked against every repair your team logs.
Recipe changes, quality checks and reports moved out of spreadsheets and into the systems that run the line, with a rollback plan for every change.
Prices exclude travel outside the UK and the Netherlands, and hardware we buy on your behalf at cost.
Two days on site, a written report in ten working days and a 90-day plan you can run with or without us.
One line connected, monitored and measured over ten to twelve weeks, with a before and after your finance team can check.
We run, tune and extend what we built, with a named engineer and a response time written into the contract.
Yes. Most lines we connect are ten to thirty years old. Where a controller cannot share data, we fit sensors on the outside instead of opening the machine.
On a server in your plant or in your own cloud account. We never keep your production data on ours, and you keep every login when we leave.
Common controllers, historians, ERP and maintenance systems. We confirm the list for your plant during the site assessment.
First live data usually arrives in three weeks. A pilot runs ten to twelve weeks, so the measurement covers normal production and a changeover or two.
That is the goal. Every engagement ends with documentation, training for two shifts and a handover checklist your maintenance lead signs.
Each result was measured against a baseline taken before we changed anything, and confirmed by the client's own team.
No result matches both filters yet.
A family bakery group with eleven lines, three sites and a maintenance team of nine wanted to know why output dropped every Tuesday.
Stops were logged on paper at the end of each shift, so the reasons blurred into "mechanical" and "other". The weekly meeting argued about numbers instead of fixing machines.
Tuesday turned out to be the day the main proofer was cleaned with a rushed restart. A changed procedure and one sensor alert removed most of the stops. Across all sites, unplanned stops fell by 31% in fourteen weeks.
For the first time the weekly meeting starts with the same numbers on every screen.
Operations director, Hollin Foods (placeholder quote)
Guides, articles and one yearly report, written by the engineers who did the work.
Nothing matches that search.
Most rotating equipment tells you it is about to fail. On older lines nobody is listening, because the machines were built before anyone thought to ask.
Bearings, gearboxes, fans and pumps cause a large share of unplanned stops on the lines we see, and almost all of them change how they vibrate long before they stop. A small sensor on the outside of the housing hears that change without touching the controller.
Start with the ten assets whose failure stops a whole line. For each one, pick the simplest sensor that can hear the fault you fear most.
| Asset | Sensor | Typical warning |
|---|---|---|
| Motor bearing | Triaxial accelerometer | 7 to 14 days |
| Gearbox | Accelerometer and oil temperature | 5 to 10 days |
| Fan | Accelerometer and current clamp | 10 to 20 days |
| Pump | Accelerometer and pressure | 3 to 7 days |
Record two weeks of normal running before you set a single alert. Include a cleaning cycle, a changeover and a cold start, or the first of each will look like a fault.
An alert that fires twice for nothing gets ignored the third time, when it matters.
Dev Okafor
Want help choosing your first ten assets? Book a site assessment.
Varrow Systems is an engineering firm of 38 people in Leeds and Rotterdam. We started in 2014 because too many plant data projects ended with a report and no change on the floor.
Every project starts with a baseline and ends with the same measurement, signed off by your plant.
Technicians and operators shape the alerts and dashboards; nobody inherits a black box.
Documentation, training and a handover checklist come with every engagement.
From a two-person controls shop to a team that has connected 140 plants.
Each of us still spends at least one week a month on a client site.
Join the teamManaging partner, Leeds, with five more engineers who lead connectivity, data, automation, delivery and operations.
We hire engineers who like being on the shop floor as much as at a keyboard. Every role below is open now.
Projects run with three to five people, so your work is visible.
A yearly learning budget and one Friday a month for training.
Site visits are planned weeks ahead, two nights away a week at most.
Office days in Leeds or Rotterdam, the rest wherever suits you.
No open role matches. We still read every open application.
Small sessions for operations and maintenance managers. Free to attend; places are limited so everyone can ask questions.
Leeds, in person · 09:00 to 12:00
Online · 15:00 CET, 45 minutes
Near Leeds, in person · twelve places
Rotterdam, in person · 14:00 to 17:00
A confirmation with the address or the join link is on its way to your inbox.
An engineer, not a salesperson, replies within one working day. A short note is enough to start.
An engineer will reply within one working day, usually with two or three questions about your lines.
Placeholder text. Replace it with policies reviewed for your company and the countries you work in.
We collect the details you send through our forms and use them only to reply, to run an event you registered for, or to send the newsletter you asked for.
Client production data stays on the client's own systems. We do not sell personal data or share it with advertisers.
You can ask to see, correct or delete your details at any time by writing to privacy@varrow.example.
The content on this website is for general information. It is not engineering advice for a specific plant; that comes after a site assessment and a written agreement.
Client names and results appear with each client's permission.
The link may be old, or the page has moved. These are the pages people look for most.